"MITSUBISHI inverter FR-F740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 3.7KW.
The use of frequency converter motor is in order to speed, and reduce the starting current.
In order to produce a variable voltage and frequency, the device is the first power of the AC power conversion to DC (DC), the process is called rectification.
The direct current (DC) is transformed into alternating current (AC) and its scientific term is "inverter" (inverter)
Q35B
General inverter is the DC power supply inverter for a certain fixed frequency and a certain voltage of the inverter.
For the inverter as the frequency adjustable, adjustable voltage inverter, we called the inverter. "MITSUBISHI inverter series: FR-A800.
Voltage level: three phase 400V.
Power: 5.5kw.
SLD converter rated current: 17.0A.
Structure and function: Standard model.
Type: CA.
Substrate coating: have.
Excellent drive performance.
FR-A800 series equipped with the latest high-speed processor. Has better control performance and response speed,
Products to ensure stable and accurate operation in a wide variety of applications.
Enhanced real-time sensorless vector control and vector control functions, can meet the needs of various kinds of machinery and equipment.
For paper, textile, wire, a variety of tape and other products of the extension of the machine processing, linear speed control is essential.
It can respond quickly to the change of production line speed and avoid the phenomenon of uneven winding.
This helps to achieve a stable supply of high quality products. For video input (NTCS/PAL) 4 channel / RGB input 1 channel composite input.
Applicable model: GT15. Joint kit for electromagnetic brake; used for.
HF-SPseries.
HF-JP53B; 73B; 103B; 153B; 203B;
353B; 503B; 703B; 903B; 534B;
734B; 1034B; 1534B; 2034B;
3534B; 5034B; 7034B; 9034BInput and output points: 2048 points.
Input / output data points: 2048 points.
Program capacity: 30K.
Basic command processing speed (LD command) s:1.0.
Optical data communication line.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
Q35B Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=Q35B&select=5