LK Automation Limited LK Automation Limited
Brand: MITSUBISHI
Go Back >> Product Catalogues
QE82LG Insulation monitoring module
MITSUBISHI QE82LG Manual And Instructions
QE82LG datasheetPDF datasheet

MITSUBISHI QE82LG Product information and technical parameters:
Brand: MITSUBISHI
Name: Insulation monitoring module
Model: QE82LG
Measurement items: leakage current (Io), resistive leakage current (Ior).
Measuring circuit number: 2 circuits.
Insulation monitoring module for measuring leakage current.
Leakage current can be measured to ensure safety by monitoring the leakage current (Io), can detect the risk of electric shock.
Insulation state measurement of resistive leakage current (Ior) can be monitored continuously and continuously,
In order to continuously monitor the insulation aging status of the equipment.
Each measurement project can be carried out in the 2 phase of the alarm monitoring can be respectively on the leakage current (Io), resistive leakage current (Ior) for the 2 phase of the alarm monitoring,
No ladder diagram program. Alarm monitoring is divided into 2 stages of attention alarm and danger alarm.
A module can measure two circuits of a module can be two circuits on the same line in the same system type power measurement.
In addition, Works2 GX (1.90U version or higher version) can be used to easily set the parameters.
Leakage current (Io), resistive leakage current (Ior).

SI/QSI/H-PCF/ broadband H-PCF optical cable.
Double circuit.
Controller network (control station / common station) / remote I/O network (remote master station).
MELSECNET/H network module capable of composing large scale flexible network system.
The MELSECNET/H network system includes the PLC network of the control station and the communication between the stations and the remote I/O network in the remote station remote I/O station QE82LG QE82LG
Optical fiber loop system...... High speed communication of 10Mbps/25Mbps is realized.
The distance between stations, the length of the total cable length, strong anti-interference.
Coaxial bus system...... Using low cost coaxial cable, the network construction cost is lower than that of the optical fiber loop network QE82LG.
Twisted pair bus system...... Combined with high performance price ratio network module and twisted pair cable,
The construction cost of network system is very low.5 slots.
The main substrate needs to be equipped with CPU and power supply.
Support for high speed communication between multi CPU.
Requires 1 power modules.
Used to install Q series modules QE82LG.
A variety of modules with excellent performance,
Meet the needs of various control from analog to location.
Q series module products include a variety of types of I/O, analog and positioning function module.
Can fully meet the switch, sensor, such as the input and output, temperature, weight, flow and motor, drive control,
As well as the requirements of high-precision control of the positioning of the industry, the control needs of various fields.
Can also be used in combination with the CPU module to achieve appropriate control.8 axis, differential drive output type.
Control unit: pulse.
Location data: 10 data / axis.
Maximum pulse output: 4Mpps.
40 pin connector.
Differential output.
Ideal solution for simple multi axis positioning.
Perfect match with stepper motor control.
Plus deceleration smooth, speed change subtle.
To speed up the speed of positioning control to start processing.
Positioning module.
Open collector output.
Differential driver output.
Based on the use of open collector outputs and differential drive output type 2 types.
Differential driver output type positioning module can transmit high speed instruction pulse (up to 4Mpps) to the servo amplifier reliably,
Transmission distance of up to 10 meters, to achieve high speed and high precision control.
(the command pulse of the open collector positioning module is highest 200kpps.)
Reduce system downtime recovery time.
With a simple operation, you can back up all the data in the CPU to the memmory card QE82LG.
Through regular backup, can be the latest parameters, procedures, etc. to save the storage card.
In the event of a CPU failure, after the replacement of CPU, can be a simple operation,
Restore the system by using the data storage ccard in advance QE82LG.
Therefore, it is not necessary to spend time to manage the backup data, but also can shorten the recovery time of the system shutdown.


...More relevant models >>>>