LK Automation Limited LK Automation Limited
Brand: MITSUBISHI
Go Back >> Product Catalogues
CL1XY4-DR1B2 Screw terminal type input and output module
MITSUBISHI CL1XY4-DR1B2 Manual And Instructions
CL1XY4-DR1B2 datasheetPDF datasheet
CL1XY4-DR1B2 User's Manual

MITSUBISHI CL1XY4-DR1B2 Product information and technical parameters:
Brand: MITSUBISHI
Name: Screw terminal type input and output module
Model: CL1XY4-DR1B2
Input type: DC input, positive public end / negative public end.
Input points: 2 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: relay output.
Output points: 2 points.
OFF leakage current: -.
Output protection function: No.
Rated load voltage / current: DC30V/AC250V/2A.
External connection: 2 line /2 line type.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition.
Can be installed along the 6 direction.

Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/7mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.25mA.
Output protection function.
Rated load voltage / current: DC24V/0 CL1XY4-DR1B2. 5A.
External connection: 1 line /1 line type.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup CL1XY4-DR1B2
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool CL1XY4-DR1B2. Screw, 2 piece type terminal.
Current output module.
Number of channels: 4 channels.
Number of stations: 2 stops.
Station type: remote equipment station.
High speed data transfer of up to 10Mbps;
The development of CC-LINK is not only to meet the control of high speed remote I/O,
But also to meet the high speed of the field of information control.
In order to achieve this goal, the transmission speed of CC-LINK is compared with that of the previous live network system to add 40 to 10Mbps CL1XY4-DR1B2.
Such a high speed can not affect the speed of the machine control while allowing a large number of data communication. Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Finger protection through the upper part of the terminal,
The human body will not be exposed to live parts,
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool. Fast connector type.
Voltage input.
Number of channels: 8 channels.
Occupied the number of stations: Ver.1 mode occupied 3 stations, Ver.2 mode occupied 1 stations.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on thhe on-line unification to adjust CL1XY4-DR1B2.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step CL1XY4-DR1B2.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.


...More relevant models >>>>