LK Automation Limited LK Automation Limited
Brand: MITSUBISHI
Go Back >> Product Catalogues
AD75P2 Positioning module
MITSUBISHI AD75P2 Manual And Instructions
AD75P2 datasheetPDF datasheet
AD75P2 User's Manual
AD75P2 HardwareUser's Manual

MITSUBISHI AD75P2 Product information and technical parameters:
Brand: MITSUBISHI
Name: Positioning module
Model: AD75P2

Cable for extended use in multiplexing unit.Multi axis positioning controller.
Coaxial data communication line function.
Program capacity: Max 60K step.
Input / output points: 1920 points.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor AD75P2.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal AD75P2
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc AD75P2. .
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points. SRAM capacity: 32K bytes.
AD59 (-S1) data storage.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust AD75P2.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can beMemory card interface, serial interface.
On-line debugging is the process that will through the simulation debugging to further carryy on the on-line unification to adjust AD75P2.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on stepp by step AD75P2.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.


...More relevant models >>>>
Last one: MITSUBISHI AD75P1
next one: MITSUBISHI AD75P3