Cable length: 0.7 meters.
Selection of A1SC05NB (A1SC07NB) cable.
SRAM memory card.
RAM capacity: 512KB. AnS, QnAS bus connection, the reader to write program 2 channel connection.Temperature sensor: PT100, 3 wire system.
The A1S62RD3 and A1S62RD4 temperature sensor input modules allow the platinum resistance temperature sensing element to be directly connected to the PLC,
This component converts a signal from a temperature measuring element to a numeric value that represents a temperature measurement value,
This temperature value can be used for the control process A1SC07B
A1SC07B
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of A1SC07B.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on A1SC07B.
This phenomenon is called the I/O delay time effect. Program memory capacity: 8k.
Input / output points: maximum 256 points.
With base plate and power supply.
PLC is the use of " sequential scanning, and constantly circulating " way to work.
That is, in the operation of CPU, PLC according to the user according to the control requirements of the coexistence of the user in the memory of the program,
According to the instruction sequence number (or address number) for periodic cyclic scan, such as no jump instruction,
From the first instruction to the user program execution sequence one by one, until the end of the program,
And then return to the first command, start the next round of the new scan, in the process of each scan,
Also complete the sampling of the input signal and the output status of the refresh and other work.
With the rapid development of microprocessor, computer and digital communication technology,
Computer control has been extended to almost all industrial fields.
Modern society requires manufacturing to respond quickly to market demand,
Production of small quantities, multi varieties, multi specifications, low cost and high quality products,
In order to meet this requirement,
Production equipment and automatic production line control system must have high reliability and flexibility,
PLC programming is to comply with the requirements of the emergence of it is based on a microprocessor based general industrial control device.
PLC programming is a digital computing operation of the electronic system,
Designed for applications in industrial environments.
It uses programmable memory,
An instruction used to perfoorm logical operations, sequence control, timing, counting and arithmetic operations in its internal storage,
And through the digital, analog input and output, control of various types of machinery or production process A1SC07B.
Programmable controlller and related equipment,
Should be easy to make the industrial control system to form a whole, easy to expand the principle design of its functions A1SC07B.