LK Automation Limited LK Automation Limited
Brand: MITSUBISHI
Go Back >> Product Catalogues
A173UHCPU-S1 cpu module
MITSUBISHI A173UHCPU-S1 Manual And Instructions
A173UHCPU-S1 datasheetPDF datasheet
A173UHCPU-S1 Common InstructionsProgramming Manual
A173UHCPU-S1 Dedicated InstructionsProgramming Manual
A173UHCPU-S1 FundamentalsProgramming Manual
A173UHCPU-S1 SV13/22 SFCProgramming Manual

MITSUBISHI A173UHCPU-S1 Product information and technical parameters:
Brand: MITSUBISHI
Name: cpu module
Model: A173UHCPU-S1

Terminal row for A2CROM capacity: 32K bytes (max 15K step).
A2A, A2A-S1, A3A, A2N, A2N-S1, A3N storage box. ME-NET interface unit.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system A173UHCPU-S1 A173UHCPU-S1
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc A173UHCPU-S1. . Input points: 32 points.
Voltage: DC12/24V.
Current: 3/7mA.
Response time: 10ms.
16 points / a common end.
Positive pole sharing.
36 point terminal station.
Each scanning process. Focus on the input signal sampling A173UHCPU-S1. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the conntrol requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC A173UHCPU-S1.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program tto do the compiler to compile the process of interpretation A173UHCPU-S1.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.


...More relevant models >>>>