Type: MIL connector.
Input form: DC input, negative public end.
Input points: 16 points.
Rated input voltage / current: DC24V (4mA).
External connection: 1 wire.
IE CC-Link field network module type remote unit.
Select input response time from 0ms/0.2ms/1ms/1.5ms/5ms/10ms/20ms/70ms.
High speed input and output control of single module can be realized by using first order logic function.
IE CC-Link field network remote equipment station
NZ1MEM-8GBSD According to the equipment, more easily distributed input and output devices.
Can be connected to the expansion module, more convenient to expand the input and output points.
Support synchronous communication (using with simple motion control module).
According to the simple motion control module of the network (Master) control cycle of the implementation of the control cycle and its synchronization,
Implementation of multiple simultaneous action from the station. Enter 32 points.
5mA DC24V.
Response time: 0.3ms.
32 point 1 public.
Output 32 points.
DC12/24V.
Leakage current: 0.1mA OFF.
Response time: 1ms. 32 point 1 public.
Protection function.
Surge.
40 pin connector.
Switching value, also known as logic, refers to only two values, 0 or 1, ON or OFF.
It is the most common control, it is the advantage of PLC control,
Is also the most basic application of PLC.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three. Screw, 2 piece type terminal
Temperature measuring resistor body input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
NZ1MEM-8GBSD Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=NZ1MEM-8GBSD&select=5