Input type: DC input, positive common end.
Input points: 8 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 8 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 3 line /2 line type.
Sensor connector type (E-CON type)
MR-EKCBL10M-H
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. MITSUBISHI inverter FR-F720 series.
Voltage level: three phase 200V.
Frequency converter capacity: 1.5KW.
When the inverter is running, the starting current and starting torque of the motor are how?
With the operation of the inverter, with the acceleration of the motor to improve the frequency and voltage,
The starting current is limited to 150% below the rated current (according to the different types of aircraft, 125%~200%).
Starting with power frequency power supply, the starting current is 6~7 times of the rated current, therefore, the impact on the mechanical and electrical.
The inverter drive can be smoothly start (start time longer).
The starting current is 1.2~1.5 times of the rated current, and the starting torque is 70%~120% rated torque;
For the inverter with the torque automatic enhancement function, the starting torque is more than 100%, which can start with full load. Connecting cable for handheld RH GOT and PLC.
Cable length: 3 meters.
Application: RS-422 connection and RS-232C connection. Twisted pair cable.
Single bus.
Remote I/O station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MR-EKCBL10M-H Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=MR-EKCBL10M-H&select=5