Power: 0.4kw.
Purpose: to suppress the power harmonics.
Improve the power factor, reduce the input side of the high harmonic current.
Make sure that this option is installed in the FR-A820-03800 (75K) and FR-A840-02160 (75K) and above capacity and above capacity.
At the same time the installation options in the use of 75kW and above motor. (the IP55 series has a built-in DC reactor.)
According to the motor power used to select the DC reactor
HG-KR43J
(when the inverter capacity is greater than the motor capacity, is still based on the motor capacity to choose.) Motor series: ultra low inertia, low power.
Rated output power: 0.2kw.
Rated speed: 3000r/min.
Whether to bring the brakes: with.
Shaft keyway: (open slot).
Protection level: IP55 does not include the shaft part and the connector.
Features: ultra low inertia is suitable for high frequency operation.
Application examples: the insertion device, the assembly machine. Input points: 32 points.
Input voltage: DC12V/DC24V/AC12V/AC24V.
Current: 4mA (DC12V/AC12V), 8.5mA (DC24V/DC24V).
Response time: 30ms (DC12/24V) /35ms (AC12/24V).
16 points / a common end.
50 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
HG-KR43J Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HG-KR43J&select=5