Analog input points: 4 points (thermocouple, PT, constant voltage input).
Output points: transistor output 4 points, 4 point CT input.
Weight: 0.4KG.
Temperature sensor with 4CH input control output,
Double position control, standard PID control,
Heating and cooling PID control, cascade control.
By using the combination of the analog output module,
PID control of voltage or current can be realized
HC-SFS102BG2 1/20
New with cascade control. Through the master / slave station of the 2 controllers,
According to the temperature change caused by external disturbance, the temperature can be adjusted quickly.
Can connect FX3GA/FX3G, FX3GE, FX3U series.
When connecting to FX3UC or FX3GC, you need FX2NC-CNV-IF or FX3UC-IPS-5V. Express PCI bus.
Support Japanese, English OS.
Multimode fiber optic cable.
Dual loop controller network (control station / common station).
Province distribution network module in cabinet and device.
Link to connect the 64 stations when the fastest scanning time for 1.2ms (rate 2.5Mbps).
According to the transmission distance, the transmission rate is selected from 2.5Mbps, 625kbps and 156kbps.
CC-Link/LT from the station does not need any parameter settings.
Only need to set up the transmission speed in the master module, you can use the remote I/O.
I/O control in the first class of open field network module.
CC-Link based on reliable field bus technology,
Able to transmit large number of bits data (such as ON/OFF information) and word data (such as analog information).
Consistency of CC-Link to maintain loop transmission,
And the cycle of transmission and information (instantaneous transmission) communication separately, so as to ensure the timeliness of.
Even if the information reaches saturation, it will not affect the link scan time.
Make the mixed data environment intelligent, to achieve a new manufacturing system IE CC-Link field network module.
Using Ethernet cables and connectors available on the market to reduce costs.
High speed communication capable of communicating with 1Gbps.
Improve the communication response, significantly shorten the cycle time.
Improve the performance of cycle data update. Reduces the transmission delay time and the application of the synchronization waiting time.
Data can be read or written to other station programmable controller.
Status of IE CC-Link field network can be confirmed by Works2 GX.
Can be in the Works2 GX up and down the abnormal position, the cause of the exception, the event record,
So it can reduce the time of abnormal to resume normal operation.
HC-SFS102BG2 1/20 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-SFS102BG2 1/20&select=5