LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
MITSUBISHI HC-RFS153BG2 1/9 Price
No PHOTO
MITSUBISHI HC-RFS153BG2 1/9
"MITSUBISHI inverter series: FR-A846.
Voltage level: three phase 400V.
Power: 22kw.
SLD converter rated current: 62.0A.
Structure and function: IP55 counterpart.
Type: CA.
Substrate coating: have.
Built in DC reactor.
Easy to operate, simple settings.
We have prepared a series of equipment and functions for you to work in any place to meet the life cycle of the product.
Allegedly, the motor power consumption accounted for about half of the total power generated by manufacturing industry consumption HC-RFS153BG2 1/9
How to achieve energy efficiency in the plant without affecting the productivity.
Less energy consumption and more output FR-A800 series inverter will help you to have both fish and bear''s paw"
Parameters and frequency settings can be modified in the program.
Inverter control, for example, by the input signal to trigger the operation of the inverter, based on the operation of the inverter
The status of the signal output, as well as the monitor output and so on, can be customized according to the requirements.
The control of each machine can be done separately by the frequency converter, and the control of the dispersion is also carried out.
Through combining with the real-time clock function can realize the automatic operation (in option FR-LU08). "Input and output points: 1024 points.
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
HC-RFS153BG2 1/9 Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=HC-RFS153BG2 1/9&select=5


...more relevant model market price >>>>
Related products