LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
MITSUBISHI HC-MFS73G1(1/12) Price
No PHOTO
MITSUBISHI HC-MFS73G1(1/12)
Power: 0.75kw.
Purpose: to suppress the power harmonics.
Improve the power factor, reduce the input side of the high harmonic current.
Make sure that this option is installed in the FR-A820-03800 (75K) and FR-A840-02160 (75K) and above capacity and above capacity.
At the same time the installation options in the use of 75kW and above motor. (the IP55 series has a built-in DC reactor.)
According to the motor power used to select the DC reactor HC-MFS73G1(1/12)
(when the inverter capacity is greater than the motor capacity, is still based on the motor capacity to choose.) MELSECNET/MINI (-S3) data link system, A2C system transfer converter.
Plastic fiber cable -GI optical fiber cable.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
HC-MFS73G1(1/12) Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=HC-MFS73G1(1/12)&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Ultra low inertia small power motor
HC-MFS73BK
MITSUBISHI Ultra low inertia small power motor HC-MFS73BK
Motor series: ultra low inertia, low pow
MITSUBISHI
Ultra low inertia small power motor
HC-MFS73K
MITSUBISHI Ultra low inertia small power motor HC-MFS73K
Motor series: ultra low inertia, low pow
MITSUBISHI
Ultra low inertia small power motor
HC-MFS73
MITSUBISHI Ultra low inertia small power motor HC-MFS73
Motor series: ultra low inertia, low pow
MITSUBISHI
Ultra low inertia small power motor
HC-MFS73B
MITSUBISHI Ultra low inertia small power motor HC-MFS73B
Motor series: ultra low inertia, low pow