Input channel number: 4.
Output channel number: 2.
Occupy I/O points: 64.
A1S63ADA analog input / output combination components can be analog / digital / digital / analog conversion,
The input and output signals can be voltage or current,
Offset and gain can be set and stored.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of
HC-MFS/KFS73G2 (1/5)
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect. Drive unit 200VAC/400VAC level.
MITSUBISHI motor general AC servo amplifier MELSERVO-J3 series.
Need conversion unit MR-J3-CR55K) supporting the use of.
Rated output: 37kw.
Interface type: general pulse interface type.
Power specification: three phase AC400V.
Pulse train and analog input as universal interface.
Can choose the position, speed and torque control mode.
The use of advanced tuning features such as advanced vibration suppression control and adaptive filter,
Greatly improve the performance of the machine.
MR-J3, your partner.
Higher performance, more features, more convenient to use.
Highest performance in the industry.
Speed response frequency up to 2.1kHz. Fiber optic cable / twisted pair cable.
Single bus.
Remote I/O station.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
HC-MFS/KFS73G2 (1/5) Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HC-MFS/KFS73G2 (1/5)&select=5