Cable length: 6m.
The connection between the CC-LINK interface unit and the smart GOT.
Applicable model: HandyGOT. Total points: 32 points.
Input points: 16 points.
Input mode: DC24V (drain type).
Output points: 16 points.
Output form: Transistor (drain type).
Connection status: connector.
In order to extend the input output of the device.
Also has a built-in power supply products.
The maximum number of points for the input and output is 256
GT2708-STBD
Expansion module: up to 16 units (in addition to the power expansion module)
The total number of CC-Link, AnyWireASLINK, and Bitty series of remote I/O is 512 points. Cable length: 2m.
For MR-J2S-700A (4) /CP/CL or less.
Encoder for HC-SFS; HC-LFS; HC-RFS; 2000r/min HA-LFS; HC-UFS servo motor.
-L represents bending life. Can be isolated from the output of the programmable controller, the a/b/c contact relay, SSR, Tr output.Cable length: 1m.
The connection between the FXCPU (MINI-DIN8 pin connector) and the graphic operation terminal.
Connection between FXCPU communication function extension board (MINI-DIN8 pin connector) and GOT.
The unit can not be used with FX1NC, FX2NC, FX3UC-D/DSS, FX3G.
Applicable models: GT10, GT21. Control axis number: 2 axes (independent, straight line arc interpolation at the same time)
Number of stations: 4 stops.
Station type: intelligent equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.