The length of the line: 2M.
IP level: IP65.
Cable lead out direction: motor shaft different side.
Bending life: high bending life.
The cable is not shielded.
Encoder with cable (motor side); for HF-KP/HF-MP series (motor shaft with side extraction). Motor series: medium inertia, medium capacity.
Using a serial absolute / incremental encoder.
Rated output power: 2.0kw.
Rated speed: 3000rpm.
With the brake: without
GT10-C30R2-6P
Shaft end: straight shaft.
When the AC servo motor has no control voltage, only the pulsating magnetic field generated by the excitation winding is generated in the stator, and the rotor is still not moving.
When the control voltage is controlled, a rotating magnetic field is generated in the stator, and the rotor rotates in the direction of the rotating magnetic field,
In the case of constant load, the speed of the motor varies with the size of the control voltage,
When the phase of the control voltage is reversed, the servo motor will reverse.Output type: transistor output, drain type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC12V/DC24V/0.5mA.
External connection: 2 wire.
Type of input and output terminal.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module. Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: AC85V ~ 132V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
GT10-C30R2-6P Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=GT10-C30R2-6P&select=5