LK Automation Limited LK Automation Limited
Brand Sort: MITSUBISHI
Home >> Price
MITSUBISHI GT10-20PSGB Price
MITSUBISHI GT10-20PSGB
DC24V transistor output module for 40 pin connector (drain type).Input and output points: 1024 points.
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Optical data communication line.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read GT10-20PSGB
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4. Cable length: 3m.
The connection between Q/LCPU and GOT/ personal computer /GTSoftGOT1000 (D-SUB9).
Applicable models: GT16, GT15, GT11, GT10, GT27, GT25, GT23, GT21. MITSUBISHI inverter FR-E720 series.
Voltage level: 3 phase 200V.
Frequency converter capacity: 15KW.
In order to ensure the reliability of production, all production machinery in the design of power with drive, there is a certain amount of surplus.
When the motor can not run under full load, in addition to meet the requirements of power driven,
The surplus torque increases the active power consumption, resulting in the waste of electric energy.
Speed control method of fan and pump equipment traditional by regulating the entrance or exit of the baffle, valve opening to regulate air flow and water flow
, the input power is large, and a large amount of energy consumption in the baffle, the valve in the process of closure.
When using variable frequency control, if the flow rate is reduced, the speed of the pump or fan can be reduced to meet the requirements.
GT10-20PSGB Operation manual/Instructions/Model selection sample download link: /searchDownload.html?Search=GT10-20PSGB&select=5


...more relevant model market price >>>>
Related products
MITSUBISHI
Resist film
GT10-40PSCW
MITSUBISHI Resist film GT10-40PSCW
Protective film for 4.7 inch screen. Tra
MITSUBISHI
GT10 memory loader
GT10-LDR
MITSUBISHI GT10 memory loader GT10-LDR
For GT1030/GT1020 used for operating sy
MITSUBISHI
RS-422 cable
GT10-C10R4-8P
MITSUBISHI RS-422 cable GT10-C10R4-8P
Cale length: 1m. For connection etween