MITSUBISHI inverter FR-L740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 15KW.
Integration of the three works the core technology, the outstanding performance of reeling, release the high cost of bright light.
Wide range of professional use and advanced control.
Professional built-in function to ensure the constant material tension, suitable for the application of printing and packaging industry
FX3GE-24MT/ES
Fusion application of the tension products of MITSUBISHI by inverter.
Suitable for tension control of high precision cable and material processing occasions.
Professional function to ensure the safe operation of textile machinery equipment,
The spinning quality and production efficiency are improved. The application of textile machinery and equipment. Cable length: 10.6 meters.
Small CPU long distance connecting cable.
For QnAS/AnSCPU/ motion control and GOT connection.
For connection between A7GT-CNB and GOT.
Combination A8GT-EXCNB and A8GT-C_BS. Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/6mA.
External connection: 3 wire.
Spring clamping terminal platform push type input module.
Input module with diagnostic function
The use of push type, do not need screw fastening, so can reduce the wiring hours.
Can be used for each 1 points to enter the wiring of the broken wire detection.
Wiring abnormality of external power supply can be confirmed.
Using 2 pieces of structure of the terminal units, maintenance can be maintained in the same line under the condition of the replacement module. Output points: 8 points.
Output voltage and current: 0.3A/1, DC12/24V point.
Response time: 2ms.
All points of independence.
Output form: transistor output, leakage type.
26 point terminal station.
Number of stations: 1 stops.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.
FX3GE-24MT/ES Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FX3GE-24MT/ES&select=5