Servo motor series: low inertia, medium and large capacity.
Rated output: 0.75kw.
Rated speed; 3000r/min.
Electromagnetic brake: incidental.
Power supply: 400V.
Most suitable for medium and large capacity, low inertia type products in high frequency operation or acceleration and deceleration operation.
Improve the environmental performance of HG-SR, HG-JR series of products using IP67.
High speed & high torque
FX-40DU-TK-ES Shorten the positioning time, achieve high-speed equipment.
100 scene, there are 100 different drive control.
In order to meet the needs of the diverse and detailed field,
MR-J4 product line configuration, providing a wealth of servo amplifier and servo motor products.
Can meet the different needs of different customers. Memory format: flash memory.
Number of steps: up to 64000 steps.
Battery support: do not.
Write, delete method: installed on the PLC through the peripheral devices to write, delete.
Note: with program transfer function. Input points: 32 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
8 points / a common end.
Cathode common.
38 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
FX-40DU-TK-ES Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FX-40DU-TK-ES&select=5