MITSUBISHI inverter FR-F740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 250KW.
The main circuit of the inverter can be divided into two categories in general: voltage type is the voltage source of the DC converter for AC inverter,
The filtering of the DC circuit is the capacitance; the current mode is the DC conversion of the current source to the AC inverter,
The DC loop filter is the inductor
FR-E720-0.75K
Why is the frequency of the inverter voltage proportional to the change?
The electromagnetic torque of any motor is the result of the interaction between the current and the magnetic flux, the current is not allowed to exceed the rated value, otherwise it will cause the heating of the motor.
Therefore, if the magnetic flux decreases, the electromagnetic torque will decrease, which leads to the reduction of the load carrying capacity. Motor series: medium inertia, medium power.
Rated output power: 0.5kw.
Rated speed: 2000r/min.
Whether to take the brake: No.
Shaft keyway: (open slot).
Protection level: IP65 (IP67).
Features: medium inertia from low speed to high speed three modes for selection, suitable for different applications.
Application examples: transmission machinery, robots, X-Y working platform.
High resolution encoder 131072p/rev (17 bit).
The encoder with high resolution ensures excellent performance and stability at low speed.
All motor dimensions are the same as before and all are compatible with the wiring.
SI/QSI/H-PCF/ wide H-PCF optical cable double loop PC (control station / common station) / remote I/O network (remote master station).
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
The length of time required to execute the instruction, the length of the user''s program, the type of instruction, and the speed of the CPU execution are very significant,
Generally, a scanning process, the fault diagnosis time,
Communication time, input sampling and output refresh time is less,
The execution time is accounted for the vast majority of.
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
FR-E720-0.75K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-E720-0.75K&select=5