Servo motor series: ultra low inertia, small capacity.
Rated output: 0.05kw.
Rated speed: 3000r/min.
Electromagnetic brake: No.
Power supply: 200V.
The rated speed is 3000r/min, the maximum speed is 6000r/min.
The maximum torque of 350% of the rated torque, high torque in the field of high rotation, only to support the HG-KR series products.
Built in absolute position encoder with high resolution.
Standard high resolution absolute position encoder (4194304p/rev (22bit))
FR-BEL-H18.5K
To achieve a higher accuracy of the positioning function.
Improve the environmental performance of HG-KR, HG-MR, HG-RR, HG-UR series of products using IP65. Cable 0.6m for the expansion of the floor, the expansion of a floor for every 1 units.Motor series: ultra low inertia, small capacity.
Using a serial absolute / incremental encoder.
Rated output power: 0.05kw.
Rated speed: 3000rpm.
With the brake with brake.
Without GB.
Shaft end: straight shaft.
The rotor of the servo motor is a permanent magnet, and the control of the servo amplifier is controlled by the U/V/W three-phase electric electromagnetic field,
The rotor rotates under the action of the magnetic field, and the encoder feedback signal of the motor is given to the driver,
According to the feedback value and the target value, the driver is compared,
Adjust the rotor rotation angle.
The accuracy of the servo motor is determined by the resolution of the encoder. Output points: 4 points.
Output voltage and current: DC12/24V.
Output response time: 2ms.
4 point /1 a public side.
Output form: transistor output, leakage type.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
FR-BEL-H18.5K Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-BEL-H18.5K&select=5