Connecting cable for handheld GOT and PLC.
Cable length: 1.5 meters.
Application: RS-422 connection (A/QnA series). 1 axis servo amplifier.
MITSUBISHI general AC servo amplifier MELSERVO-J4 series.
Rated output: 5.0kw.
Interface: SSCNET III /H.
Power supply: three phase AC400V.
0.6kW and 1kW above the servo amplifier.
Servo amplifier supporting SSCNET III /H.
Complete synchronization system capable of using high speed serial optical communication
AX4
Can be combined with the servo system controller to maximize the performance of the servo system.
Improve mechanical properties by high performance motor.
By improving the resolution and processing speed of the encoder,
The rotating servo motor has higher precision and better performance of rotation.
Only open a key type of adjustment function, can be carried out including mechanical resonance filter, high end seismic control II, low pass filter servo gain adjustment.
Easily start advanced seismic function, it can maximize the mechanical properties.
It can automatically adjust the required response settings automatically. RS-232C/RS-422 converterInput and output points: 1024 points.
Input / output data points: 1024 points.
Program capacity: 14K.
Basic command processing speed (LD command) s:0.20.
Optical data communication line function (GI cable).
Integral type: the PLC components are installed together or a few pieces of printed circuit board,
And together with the power supply installed in the casing to form a single overall called the host or the basic unit, small, ultra small PLC using this structure.
Modular: PLC is the basic components of a separate module.
Medium and large PLC used this way. Easy maintenance.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
User program storage capacity: it is a measure of how much the user application can store the number of indicators.
Usually in words or K words as units. 16 bit binary number is a word,
Every 1024 words are 1K words. PLC to store instructions and data in words.
General logical operation instructions each account for 1 words. Timer / counter,
Shift instruction accounted for 2 words. Data operation instructions for 2~4.
AX4 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=AX4&select=5