Servo motor series: low inertia, medium and large capacity.
Rated output: 8.0kw.
Rated speed; 1000r/min.
Electromagnetic brake: incidental.
Power supply: 200V.
Most suitable for medium and large capacity, low inertia type products in high frequency operation or acceleration and deceleration operation.
Improve the environmental performance of HG-SR, HG-JR series of products using IP67.
High speed & high torque
A1SJ71E71N-B2 Shorten the positioning time, achieve high-speed equipment.
100 scene, there are 100 different drive control.
In order to meet the needs of the diverse and detailed field,
MR-J4 product line configuration, providing a wealth of servo amplifier and servo motor products.
Can meet the different needs of different customers. The length of the line: 2M.
IP level: IP65.
Cable lead out direction: motor shaft different side.
Bending life: standard.
The cable is not shielded.
Encoder with cable (motor side); for HF-KP/HF-MP series (motor shaft with side extraction). Control axis number: 2 axes (independent, straight line arc interpolation at the same time)
Number of stations: 4 stops.
Station type: intelligent equipment station.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
A1SJ71E71N-B2 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=A1SJ71E71N-B2&select=5