Power: 15kw.
Voltage: 200V.
Purpose: high frequency braking resistor.
The braking ability provided by the braking capacity is larger than that provided by the external braking resistor.
Can also be connected without built-in brake transistor inverter.
Three types of discharge resistors are available.
Please select according to the required braking torque. Motor series: low inertia, small capacity.
Using a serial absolute / incremental encoder
NZ2GFCM1-16DE
Rated output power: 0.05kw.
Rated speed: 3000rpm.
With the brake: without.
Shaft end: straight shaft.
AC servo motor and brushless DC servo motor in the function of the difference: AC servo is better, because it is a sine wave control, torque ripple small.
DC servo is a trapezoidal wave. DC servo is simple and cheap. Transmission speed: 156kbps/625kbps/2.5Mbps/5Mbps/10Mbps (automatic tracking).
Station No.: 1~64 station.
External connection mode: 2 pieces of spring clip terminal.
Spring clip terminal.
The safety controller can communicate with the master station of the CCLINK system.
The data from the security controller to the master station can be edited by the parameters.
The security controller receives the data from the master station to set the tag name.
Transmission speed according to the automatic tracking station, do not need to set the transmission speed.
By using the spring clamping terminal, the wiring time and the maintenance time of the CC-Link cable can be reduced.
No need to re write parameters after replacement of the module.
The security controller can be set up and connected with the monitoring software.
Confirm the error record that is detected. 8 slots.
Installation of the power unit can not be used for AnS QnAS/ series units installed.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
PLC user program is designed according to the control system of the process control requirements,
PLC programming language through the preparation of specifications, in accordance with the actual needs of the use of the function to design.
As long as the user can master some kind of standard programming language,
To be able to use PLC in the control system,
To achieve a variety of automatic control functions.
NZ2GFCM1-16DE Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=NZ2GFCM1-16DE&select=5