Power: 2.2kw.
Purpose: to suppress the power harmonics.
Improve the power factor, reduce the input side of the high harmonic current.
Make sure that this option is installed in the FR-A820-03800 (75K) and FR-A840-02160 (75K) and above capacity and above capacity.
At the same time the installation options in the use of 75kW and above motor. (the IP55 series has a built-in DC reactor.)
According to the motor power used to select the DC reactor
HG-SR301
(when the inverter capacity is greater than the motor capacity, is still based on the motor capacity to choose.) Type: MIL connector.
Input form: DC input, negative public end.
Input points: 16 points.
Rated input voltage / current: DC24V (4mA).
External connection: 1 wire.
IE CC-Link field network module type remote unit.
Select input response time from 0ms/0.2ms/1ms/1.5ms/5ms/10ms/20ms/70ms.
High speed input and output control of single module can be realized by using first order logic function.
IE CC-Link field network remote equipment station. According to the equipment, more easily distributed input and output devices.
Can be connected to the expansion module, more convenient to expand the input and output points.
Support synchronous communication (using with simple motion control module).
According to the simple motion control module of the network (Master) control cycle of the implementation of the control cycle and its synchronization,
Implementation of multiple simultaneous action from the station. 2 slots.
To install the power supply.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
HG-SR301 Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HG-SR301&select=5