Master station module for CC-Link/LT.
I/O control can be used in the province of CC-LINK/LT.
Is to make PLC CC-LINK/LT as the main station of the FX system module.
The master station module and the remote I/O module can be connected by a special connector, and achieve the purpose of the distribution of the province.
Up to 64 remote I/O station modules can be connected.
Remote I/O module is assigned a common X, Y soft components,
By using the same procedure as the common input and output
HA-LP601B
Even if the use of 2 points, 4 points of the remote I/O module, the number of soft components can be continuously assigned,
So it can be efficiently allocated I/O. 10.4 inches.
Surface treatment: anti reflective film.
Protective film color: No.
USB protection cover parts: there is an opening.
Set number: 5.
Applicable models: GT27, GT25. Description: GI type optical fiber cable with (combination of 2 sets of use), the maximum number of connections: 2, the longest transmission distance: 2000m.
Spare 5 products for different purposes.
Thin waterproof type relay hub.
Extension of star type wiring and main line length, waterproof structure.
Spring clip terminal type relay hub.
Star type wiring, length of the main line, spring clamping terminal table type.
Relay appliance (T branch) unit.
Extension of T type branch and trunk length.
Relay unit in light.
In the presence of interference in the environment of the wiring, the length of the trunk line.
Relay unit in space light.
Communication between linear moving bodies. Analog channel: 12 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/12 channel.
Analog module installation.
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
HA-LP601B Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=HA-LP601B&select=5