Type: 18 point terminal.
Output form: transistor output, leakage type.
Output points: 16 points.
Rated input voltage / current: DC12/24V (0.5A).
External connection: 1 wire.
Can be on the remote /O I module, analog module, high-speed counter module free extension of input and output points.
The analog input module can be extended, and the sampling time of the analog and digital conversion values can be controlled by the external input signal
FR-L740-15K-CHT (trigger conversion function)
Scalable high-speed counter module, ON/OFF control in the implementation of accurate cycle. (cam switching function)
IE CC-Link field network remote equipment station. According to the equipment, more easily distributed input and output devices.
Can be connected to the expansion module, more convenient to expand the input and output points.
Support synchronous communication (using with simple motion control module).
According to the simple motion control module of the network (Master) control cycle of the implementation of the control cycle and its synchronization,
Implementation of multiple simultaneous action from the station. Can be isolated to obtain DC24/48/100V, AC100/200V input signal.Output points: 4 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
4 point /1 a public side.
Output form: relay output.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
FR-L740-15K-CHT Operation manual/Instructions/Model selection sample download link:
/searchDownload.html?Search=FR-L740-15K-CHT&select=5